Ruwwad Laser
WhatsApp us Get a Quote
For contractors · MEP

MEP project identification package

Before handover the consultant requires every valve, cable and panel to be identified. Instead of collecting them from several workshops, send us the project schedules and we deliver the whole package: valve and cable tags, panel labels, LOTO tags and safety signs — numbered from your file and sorted by floor and system.

One schedule, one supplierSorted by floor and systemSample for approval firstPhased delivery
Numbered valve tags on a pipeline in an MEP project
6+Identification types in one package
100%Numbers matched to your schedules
6Hours to start after approval
1Accountable supplier for it all

Why one package instead of scattered orders?

MEP identification usually comes at the end of the project, under handover pressure: valve tags from one workshop, safety signs from a printer, panel labels from a third supplier. The result is numbers that don't match the schedules, colours that differ between systems, and follow-up with several parties.

With the package we receive the project schedules once — valve schedule, cable schedule, panel list — engrave every piece with its number from the file, check the numbers against the schedule, and deliver them bagged by floor or system with a copy of the schedule to make installation and inspection easy.

What the package needs from you

  • The project schedules (Excel or PDF): valves, cables, electrical panels.
  • The identification clause from the project specification if available — material, size, colours and character height.
  • The required delivery date, and whether phased delivery by work progress is preferred.
What the package includes

Everything project identification needs

Valve tags

Stainless, brass or service-coloured aluminium, with valve number and line service.

Valve tags

Cable ID tags

Stainless strips with cable and circuit numbers, with fixing ties.

Cable tags

Electrical panel labels

Traffolyte or coloured aluminium: panel name, switches and distribution circuits.

Traffolyte labels

LOTO tags

Lockout/tagout tags for maintenance and operations teams.

LOTO tags

Safety signs

Warning, mandatory and emergency signs for electrical and pump rooms.

Safety signs

Route markers

Markers for buried pipe and cable routes.

Route markers
Package summary

Usual materials per item

ItemCommon materialSource in the project
Valve tagsStainless 316, brass, coloured aluminiumValve schedule
Cable tagsStainless 304/316Cable schedule
Panel labelsTraffolyte or anodised aluminiumPanel and circuit list
LOTO and safety signsAluminium or PVC depending on locationProject safety specification
Route markersBrass or stainlessRoute drawings

We send a sample of each item for the consultant's approval before running the full quantity.

Samples

From the package

Images are illustrations and visual samples of the service, not delivered client work.

Clear steps

From the project schedules to delivery

Send the design or the list

A logo file, a photo, or just a list of texts in Excel — with size, quantity and where it will be used.

Proof and quote

We send a digital proof of the final look and a clear price before any production.

Production

Production starts within 6 hours of proof approval, with a first sample for large batches.

Inspection and delivery

100% check of every text and number before delivery, sorted and numbered to your list.

For contractors

More for the same project

Contracting metal projects

Cutting, forming and fabricating the project's metal parts in quantity.

Open the page

Equipment data plates

Data plates and serial numbers for pumps and equipment.

Open the page

Signage plates

Door, room and floor plates for the same building.

Open the page

Browse all Ruwwad Laser services

FAQ

Questions our clients often ask

Yes. The package is flexible: you can start with valve and cable tags, for example, and add panel labels and safety signs later with the same numbering and look.

Send us the identification clause of the project specification and we follow the required material, size, colours and character height, sending a sample of each item for approval before the full run.

Bagged and sorted by floor or system as you prefer, with a copy of the schedule and the fixings. For large projects, delivery can be phased to match work progress.

Production starts within 6 hours of approving the samples and the quote; the full duration depends on the number of pieces and items — we state it in writing with the quote.

Request a quote

Send the project schedules

Attach the valve or cable schedule or the panel list, and mention the required delivery date.

WhatsApp — fastest0550214342
LocationJeddah, Saudi Arabia
Working hoursSat – Thu, 8AM – 6PM

On submit, WhatsApp opens with a message containing your details to send to us.

The whole project's identification — from one supplier

Send the schedules and get samples and a quote quickly.